| Work Breakdown Structure (WBS) | Structure de découpage du projet (SDP) |
| A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables. | Décomposition hiérarchique du contenu total du projet, qui définit le travail que l’équipe de projet doit réaliser pour atteindre les objectifs du projet et produire les livrables requis. |
A Work Breakdown Structure (WBS) can be organized visually as follows:
Top Level: The overall project title (e.g., “Hotel Room Renovation Project”).
Second Level: Major deliverables or phases, such as:
- Planning
- Design
- Renovation
- Inspection
- Finalization
Third Level: Subtasks under each major deliverable. For example:
- Planning
- Budget Estimation
- Project Timeline
- Design
- Room Layout Design
- Material Selection
- Color Schemes
- Renovation
- Demolition
- Electrical Work
- Plumbing Updates
- Flooring Installation
- Painting and Finishing
- Inspection
- Quality Checks
- Compliance Inspections
- Finalization
- Furnishing the Room
- Final Walkthrough
- Client Approval
Each level of the WBS breaks the project down into finer details, making it easier to manage and track progress. It is visualized as a tree diagram, with the project at the top and branches representing the deliverables and tasks beneath it.